## Step 1: Initial Consultation (Week 1)
Your solar journey begins with a consultation where installers assess your home and energy needs.
### What Happens:
- Roof inspection and measurements
- Shading analysis
- Energy usage review
- System design recommendations
- Preliminary cost estimates
### What You Need:
- Recent electricity bills
- Roof information
- Energy goals and timeline
## Step 2: System Design & Proposal (Week 1-2)
The installer creates a custom solar design for your home.
### Includes:
- Panel layout and positioning
- System size (kW)
- Equipment specifications
- Production estimates
- Final pricing
- Financing options
## Step 3: Contract Signing & Permits (Week 2-4)
After accepting the proposal, the installer handles permitting.
### Required Permits:
- Building permit from your city
- Electrical permit
- Utility interconnection agreement
- HOA approval (if applicable)
Timeline: 2-6 weeks depending on location
## Step 4: Equipment Procurement (Week 4-6)
The installer orders your solar equipment.
### Components:
- Solar panels
- Inverters (string or micro)
- Racking and mounting hardware
- Monitoring equipment
- Optional battery storage
## Step 5: Installation Day(s) (Week 6-8)
Professional crews install your system, typically in 1-3 days.
### Day 1: Preparation
- Safety setup
- Roof protection
- Staging equipment
### Day 2-3: Installation
- Mount racking system
- Install solar panels
- Run electrical wiring
- Install inverter(s)
- Connect to main panel
### What to Expect:
- 2-6 crew members on site
- 8-10 hour work days
- Some noise and activity
- Temporary power interruption
## Step 6: Inspection (Week 8-10)
Local building department inspects the installation.
### They Check:
- Structural integrity
- Electrical connections
- Code compliance
- Safety measures
Most systems pass on first inspection.
## Step 7: Utility Connection (Week 10-12)
The utility company reviews and approves your system.
### Process:
- Submit interconnection application
- Utility inspection
- Install net meter
- Grant permission to operate (PTO)
## Step 8: System Activation
Once you receive PTO, your system is activated!
### Post-Activation:
- Installer trains you on monitoring
- You start generating solar power
- Net metering begins
- Warranty registration
## Tips for a Smooth Installation
1. **Clear the Area**: Move vehicles and outdoor items
2. **Secure Pets**: Keep them safe during installation
3. **Communicate**: Ask questions throughout the process
4. **Monitor Weather**: Be flexible with timing
5. **Plan Access**: Ensure crew can reach your roof
6. **Protect Valuables**: Cover items in the attic
## Timeline Summary
Total time: 2-3 months
- Consultation to contract: 1-2 weeks
- Permits: 2-6 weeks
- Equipment: 2-4 weeks
- Installation: 1-3 days
- Inspection & activation: 2-4 weeks
## After Installation
Your responsibilities:
- Monitor system performance
- Clean panels occasionally
- Schedule annual maintenance
- Report any issues promptly